The EssentialsScheduleDeficienciesCommunicationsPricingFirst month

    The AI built for
    builders.

    Allfred plans. You build.

    The Essentials

    I’m Allfred.

    I measure my success in hours given back to the job site — not time wasted behind a screen.

    Most construction software tries to do everything and ends up too bloated for the field. You pay month after month, only to end up chasing subs one by one anyway.

    I’m not another piece of software. I’m your site assistant.

    I do three things, and I do them right: keep your schedules live, clear deficiencies without friction, and stream info directly to your subs — SMS or email, one link is all it takes. No bloated features. Just the essentials — crystal clear on site, seamless at your desk.

    My story, my vision

    Schedule

    A production calendar that adapts on the fly.

    I recalculate your dates in real time — keeping your handover right on target.

    Gantt charts crammed with unreadable arrows on a phone at 8 a.m. are history. I turn your schedule into a clean, simple feed where every phase updates itself. Framing, roofing, paint, baseboards — your entire site lives here.

    Plan

    Shift one date.I realign the entire chain.

    Formwork delayed? Drag the step, and every task down the line recalculates automatically.

    LB-ST-308 du Ruisseau

    Longueuil, QC
    In progress
    OverviewScheduleDeficiencies
    August 2026
    Anchor
    Scheduled

    Excavation

    Digging for foundations and utility connections.
    Excavation MDF inc. — François Masson
    Aug 4 -> 6, 2026 — 3 days
    Anchor
    Unassigned

    Footing formwork

    Setting forms for concrete footings.
    Aug 17 -> 18, 2026 — 2 days
    Linked
    Unassigned

    Footing pour

    Pouring concrete for footings.
    Aug 19, 2026 — 1 day

    Operate

    Ditch the unreadable Gantt.Your site, framed as a live feed.

    A vertical, seamless view custom-built for your phone screen at 8 a.m.

    LB-ST-308 du Ruisseau

    Longueuil, QC
    In progress
    OverviewScheduleDeficiencies
    Past events
    30
    March 3 to July 6, 2026
    JULY 2026
    Linked
    In progress

    Drywall, masonry, and siding

    Finitions Laval inc. — Sophie Tremblay
    July 7 -> Aug 3, 2026 — 10 days (28 calendar days)
    AUGUST 2026
    Linked
    Scheduled

    Taping and gutters

    Couvreurs du Nord — Jean Lavoie
    Aug 4 -> 10, 2026 — 5 days (7 calendar days)
    Anchor
    Scheduled

    Doors and windows

    Menuiserie Bélanger — Marc Bélanger
    Aug 11 -> 18, 2026 — 6 days (8 calendar days)

    Adapt

    Lock your handover date.I build the rest backward.

    Set your target completion date: I calculate the timeline in reverse to pin down every start date.

    LB-ST-308 du Ruisseau

    308 du Ruisseau
    To plan
    OverviewScheduleDeficiencies
    NOVEMBRE 2026
    Linked
    Scheduled

    Finitions intérieures

    10 -> 24 nov. 2026 — 10 jours
    DÉCEMBRE 2026
    Linked
    Scheduled

    Remise des clés

    1 décembre 2026 — date de fin

    Anticipate

    Schedule conflicts,caught before they happen.

    A sub booked on multiple sites at once? I alert you before delays ever hit the ground.

    Edit event

    DescriptionAssignment

    Description

    Installing faucets, toilets, and sinks.

    Calendar Warning

    Simon Lachance is already booked on this date for the following project:

    Check the conflicts to accept:

    Control

    One-click analysisto protect your delivery.

    I comb through your schedule to spot missed steps, delays, and tight buffers.

    Schedule health

    Allfred

    No major blockers, but there are unverified tasks to review and incomplete steps to clear up.

    • Probable missing validation

      "Footing formwork" is still set to "To review" even though "Footing pour" is already validated. Mark it Validated if complete.

    • Incomplete step

      "Flooring" is still incomplete. Update the status or dates before moving forward.

    • Tight turnaround

      Only 2 days left between task completion (Sept 23, 2026) and handover (Sept 25, 2026) — zero room for error.

    • Trade double-booked

      Excavation AMG inc. is scheduled on another job (MH-Belvédère-23) during the same period (Aug 7–11, 2026).

    Deficiencies

    Site inspections.Zero paperwork.

    Snap a photo on site or get one from a client — I read the issue, you assign the sub.

    The schedule keeps the job moving; deficiencies get you to handover without a fight. Whether it’s a minor finish detail or a major foundation fix, the process is dead simple: a photo on file, a direct link to the sub, and your sign-off once the job is inspected.

    Capture

    Snap the issue.I write the punch item for you.

    Take the photo on site: I read the image and draft the title and description automatically.

    Add deficiency

    Allfred AI

    Photo of the issue

    Suggested by Allfred

    Excessive window condensation

    Visible condensation between glass panes indicates a failed seal. Check joint integrity and arrange replacement if necessary.

    Suggested title and details — edit anytime.

    Visible condensation between glass panes indicates a failed seal. Check joint integrity and arrange replacement if necessary.

    Unify

    Tight follow-up,from photo to fix.

    Every flaw is logged, tied to the project, and tracked live until it’s fully closed out.

    LB-ST-308 du Ruisseau

    Longueuil, QC
    In progress
    OverviewScheduleDeficiencies
    Pre-handover
    In progress

    Baseboard — hallway

    Missing baseboard at the bottom of the wall near the main entrance.
    Menuiserie Lavoie
    Sept 18, 2026 — 1 day
    1
    Post-handover
    Scheduled

    Drywall crack

    Vertical crack at the corner of the living room window.
    Plâtrier Pro inc.
    Oct 2, 2026 — 2 days

    Organize

    Pre-handover or warranty:assign ownership instantly.

    Categorize each item by project phase and hold the right sub accountable from day one.

    New deficiency

    Pre-handover
    Subcontractor
    Baseboard — hallway
    Missing baseboard at the bottom of the wall, main entry side.
    1
    Sept 18, 2026

    Control

    “Fixed” doesn’t mean“signed off by you.”

    The sub marks the fix complete. You inspect and approve — two clear steps, total quality control.

    LB-ST-308 du Ruisseau

    Longueuil, QC
    In progress
    OverviewScheduleDeficiencies
    Post-handover
    Validated

    Door — misaligned

    Patio door won’t close properly after winter.
    Menuiserie Lavoie
    Post-handover
    Completed

    Window — right sash

    Upper sash doesn't close flush.
    Vitrerie Nord

    Gather

    One central logacross all your job sites.

    Filter by status, project, or sub: keep total visibility on every active fix.

    Dashboard

    Deficiency Register

    Pre-handover and warranty items.

    AllOpenScheduledTo Review
    Post-handover
    Open

    Excessive window condensation

    MH-Belvédère-23

    Visible condensation between panes indicates a broken seal. — 1 day

    Logged July 29, 2026
    Pre-handover
    To Review

    Foundation wall joints

    MH-Belvédère-23

    Repoint concrete joints between foundation and front wall base. — July 17, 2026 (1 day)

    Logged July 14, 2026
    Post-handover
    Scheduled

    Torn door screen — main entry

    SAR-351

    Visible tear in front door screen. Repair or replace mesh.

    Excavation AMG inc. — Anne-Marie GagnonAug 3, 2026 — 1 day
    Logged July 24, 2026
    Pre-handover
    To Review

    Foundation wall

    SAR-351

    Repoint foundation wall joints at the front of the unit.

    Les Bâtisseurs Organisés inc. — Daniel BarretteMarch 24, 2026 — 1 day
    Logged March 24, 2026

    Communications

    SMS or email.Zero apps forced.

    One link to confirm. Free access whenever they want to track their jobs.

    Your subs don’t need an account or software downloads. I send assignments by text or email — their choice. A single secure link lets them view the task, check dates, and hit confirm. If they come back, all their jobs are centralized in one place, completely free for them.

    Engage

    One direct message.Zero passwords.

    Text on site or email at the desk: your subs access dates and job specs in a single tap.

    Assign

    Description

    Faucet, toilet, and sink installation.

    Selected

    Simon Lachance

    Plomberie Lachance inc.

    Preferred channel

    SMS
    Email

    Track

    Watch confirmationsroll in live.

    See in real time who viewed, confirmed, or declined. No guesswork, no chasing phone calls.

    OverviewScheduleDeficiencies
    Linked
    Scheduled

    Plumbing finish

    Plomberie Lachance inc.Confirmed

    Sept 1 -> 2, 2026 — 2 days

    Linked
    Scheduled

    Electrical finish

    Électro Saint-Jean inc.Pending

    Sept 3 -> 4, 2026 — 2 days

    Linked
    Scheduled

    Final paint

    Peinture Pro inc.Viewed

    Sept 5 -> 9, 2026 — 3 days

    Linked
    Scheduled

    Baseboards and trim

    Menuiserie BélangerDeclined

    Sept 10 -> 11, 2026 — 2 days

    Warn

    Date shifted?Notify everyone in one tap.

    The “Re-notify” banner catches affected steps. Open it, hit send, done.

    Résidence Saint-Jean

    Saint-Jean-sur-Richelieu, QC
    In progress
    OverviewScheduleDeficiencies

    To re-notify (2)

    Dates changed after confirmation.
    Linked
    Scheduled

    Electrical finish

    Électro Saint-Jean inc.
    Sept 6 -> 7, 2026 — 2 days
    Linked
    Scheduled

    Final paint

    Peinture Pro inc.
    Sept 10 -> 14, 2026 — 3 days

    Return

    A free portalfor your subs.

    Partners sign in for free to find every job assignment gathered in one clean view.

    Hello Simon.

    Here’s your briefing for Thursday, July 30

    My assignments

    Deficiency
    Validated

    Kitchen p-trap leak

    Slow leak at trap connection under sink. Replace seal — photos attached.

    Résidence Saint-Jean

    Invited by Les Bâtisseurs Organisés inc.Pre-handover · Aug 28, 2026221 rue Principale, Saint-Jean-sur-Richelieu, QC
    22 notes
    Job Site
    Confirmed

    Plumbing finish

    Résidence Saint-Jean

    Invited by Les Bâtisseurs Organisés inc.Sept 1 -> 2, 2026 — 2 days221 rue Principale, Saint-Jean-sur-Richelieu, QC
    Deficiency
    Completed

    Dripping laundry faucet

    Constant drip at laundry sink. Replace cartridge before handover.

    Condos Belvédère

    Invited by Les Bâtisseurs Organisés inc.Pre-handover · Sept 5, 202688 rue du Belvédère, Longueuil, QC
    11 note
    Job Site
    Scheduled

    Washer hookup

    Condos Belvédère

    Invited by Les Bâtisseurs Organisés inc.Sept 12 -> 13, 2026 — 1 day88 rue du Belvédère, Longueuil, QC

    Consolidate

    Your subcontractor directorybuilds itself.

    Assign a sub to a job and their profile creates automatically — complete with projects, contact info, and licence details.

    Dashboard

    Directory

    Entities created, active, or invited.

    AllConnectedPending
    Search...
    Analyze
    External

    Menuiserie Lavoie

    Jean Lavoie · 819-555-0123

    45 rue du Commerce, Sherbrooke, QC

    RBQ: 1234-5678-014 projects · 9 events
    External

    Plomberie Lachance inc.

    Simon Lachance · 514-555-0198

    88 rue du Belvédère, Longueuil, QC

    —0 projects · 0 events
    External

    Excavation AMG inc.

    Marc Gagnon · 450-555-0142

    1200 boul. Industriel, Granby, QC

    RBQ: 9876-5432-013 projects · 6 events
    ExternalInsurance Expired

    Couverture Nord-Sud inc.

    Pierre Morin · 418-555-0167

    780 rue des Pins, Québec, QC

    RBQ: 4521-8890-012 projects · 5 events
    External

    Électro-Services Dubois

    Sophie Dubois · 514-555-0184

    12 ave. du Parc, Montréal, QC

    RBQ: 3344-2211-015 projects · 11 events

    Transparent pricing

    Straightforward business.

    You use it, you pay. It’s not a fit, you walk.

    I don’t believe in 14-day trials that hound you for a credit card, or annual contracts locked in before you’ve tested the engine on site. I believe in straight business — clear pricing, zero checkout traps, zero hidden fees.

    I’m serious about what I build. I expect the same from the people who run it: one full month on real job sites, with your real subs, then a clear decision. If I fit, we keep going. If not, you cancel in a single click.

    Why I run things this way — My story, my vision

    Three needs, three plans.

    Most popular

    PlanEntrepreneur

    For the contractor running their own jobs.

    $299
    / month

    No contract — cancel anytime in one click

    • ·Up to 3 internal users
    • ·1 company
    • ·Built for solo operators or small crews
    • ·Email support (fast response)

    PlanTeam

    For contractors scaling up their operations.

    $399
    / month

    No contract — cancel anytime in one click

    • ·Unlimited internal users
    • ·1 company
    • ·Designed for multiple project managers
    • ·Email support (fast response)

    PlanMulti-Company

    For contractors structuring multiple assets.

    $499
    / month

    No contract — cancel anytime in one click

    • ·Unlimited internal users
    • ·Multiple companies (registered entities)
    • ·Ideal for managing multiple business entities under one roof
    • ·Phone support (exclusive)

    Most popular

    PlanEntrepreneur

    For the contractor running their own jobs.

    $299
    / month

    No contract — cancel anytime in one click

    • ·Up to 3 internal users
    • ·1 company
    • ·Built for solo operators or small crews
    • ·Email support (fast response)

    PlanTeam

    For contractors scaling up their operations.

    $399
    / month

    No contract — cancel anytime in one click

    • ·Unlimited internal users
    • ·1 company
    • ·Designed for multiple project managers
    • ·Email support (fast response)

    PlanMulti-Company

    For contractors structuring multiple assets.

    $499
    / month

    No contract — cancel anytime in one click

    • ·Unlimited internal users
    • ·Multiple companies (registered entities)
    • ·Ideal for managing multiple business entities under one roof
    • ·Phone support (exclusive)

    Most popular

    PlanEntrepreneur

    For the contractor running their own jobs.

    $299
    / month

    No contract — cancel anytime in one click

    • ·Up to 3 internal users
    • ·1 company
    • ·Built for solo operators or small crews
    • ·Email support (fast response)

    PlanTeam

    For contractors scaling up their operations.

    $399
    / month

    No contract — cancel anytime in one click

    • ·Unlimited internal users
    • ·1 company
    • ·Designed for multiple project managers
    • ·Email support (fast response)

    PlanMulti-Company

    For contractors structuring multiple assets.

    $499
    / month

    No contract — cancel anytime in one click

    • ·Unlimited internal users
    • ·Multiple companies (registered entities)
    • ·Ideal for managing multiple business entities under one roof
    • ·Phone support (exclusive)

    All plans include: unlimited sites and projects · unlimited subs, SMS, and emails.

    Simple. Zero traps.
    No forced demos, no gimmick trials.
    Go monthly and cancel whenever you want. Lock in annually to save $1,080.

    Your first month

    How we get started.

    Pay for one month. Test it on site. Stay monthly — or switch to annual to save.

    No sandbox, no sales pitch. Here’s what your first four weeks look like — the actual step-by-step after you sign up.

    Pay

    One month.Zero contract.

    Entrepreneur plan: $299 for month one.Full access — on your real jobs, not a sandbox.

    Test

    30 days onyour active sites.

    Bring in your projects, assign your crews.Schedules, auto-recalc, deficiencies — everything runs for real.

    Save

    Stay monthly,or lock in annual.

    Keep your monthly plan as long as you like.Switch to annual whenever you’re ready to pocket 30% savings.

    Cancel

    One click,you’re out.

    Not sold?Cancel in a single click — you’ll never be billed again.

    A human in your corner, if you want one.

    15 minutes with the team.

    Zero pressure. Whether you’re on the fence or just activated your first month — two options, fifteen minutes max, never a sales pitch.

    DemoOptional

    Want to see itbefore you buy?

    15 minutes — a straight-shooting demo on a live schedule. No 45-minute pitch, promised.

    WalkthroughOptional

    You don’t have tofly solo.

    15 minutes — a hands-on onboarding session using one of your actual projects. We set up, assign, and share together.

    Request a session.
    Demo or walkthrough — fifteen minutes, on your schedule. Never a 45-minute pitch.

    Allfred plans. You build.

    On desktop, tablet, or phone —
    the same clarity, wherever you build.

    © 2026 Technologies Jobmax inc. — Allfred